<li id="8ubq9"><tr id="8ubq9"></tr></li>
    <tbody id="8ubq9"></tbody>

      <em id="8ubq9"></em>

    1. <nav id="8ubq9"></nav>

    2. <progress id="8ubq9"><big id="8ubq9"></big></progress>
      <th id="8ubq9"><track id="8ubq9"><rt id="8ubq9"></rt></track></th>
      <rp id="8ubq9"></rp>
      <em id="8ubq9"></em>
      1. <dd id="8ubq9"><noscript id="8ubq9"></noscript></dd>

         

        E-mail page
        Print

        ATA Home | 中文版 
        Last updated March 10, 2006

        Factory Tour

        In order to make the best quality UPS and take better control on production and delivery time, we even make the some of raw material, such as transformer and heat sink by ourselves due to our current big quantity, to control all cost.

         

         

         

        For our production soldering line, its function is to solder and tidy the half-finished PCB before send to assembling line. The stable performance of PCB is the heart of UPS.


        production line-soldering

         

         

         

        After component insertion to PCB and PCB soldering, the next procedure is to assemble all parts, including transformer, UPS case, batteries, to form the UPS. There are two QC at the beginning and end of assembling line to control the quality. The next step is QA testing before packing. The production is under very strict control to make sure the best quality.


        productin line-assembling

         

         

         

        In order to control the quality of transformer, we even make the transformer by ourselves. All employment hired has many years' experience on this field.


        Transformer production line

         

         

         

        Wave-crest-soldering machine
        Only few factories own the wave-crest-soldering machine, which serve as to solder the PCB again after man-power soldering in order to harden and shine the soldering point.

        No. of Total Staff
        ? 100 to 150

        No. of R&D Staff
        ? 10 to 19

        Types of Plant & Machinery in Factory
        ? Assembling production lines
        ? Soldering production lines
        ? Electrical component insertion line
        ? Wave-crest-soldering machine

        Investment on Manufacturing Equipment
        ? US$100,000 to 199,999

        Current monthly Capacity
        ? 10,000 to 19,999 offline UPS
        ? 800 to 1,000 online UPS


        Maximum Monthly Capacity
        ? 30,000 to 39,999 offline UPS
        ? 1,000 to 1,999 online UPS

        Contact Details

         

        Shante Zhuhai Electronics Co., Ltd.
        Tel: +86-757-86369105
        Add: 2nd Floor, H Building, Beiyue Industrial Zone, Guicheng Nanhai, Foshan City, GD China
        Postal code: 528000
         
        Key Contact:
         
        James
        General Manager
        E-mail:james@maxiups.com
        Mobile:+8613923273922
         
        Website
        http://www.wupianzi.com 

        Copyright ? 2006 ATAUPS.COM Copyright ? 2006 ATAUPS.COM All rights reserved. Reproduction in whole or in part in any form or medium without the express written permission of ATAUPS.COM and ATAUPS.COM is prohibited.
        Terms of use | Privacy Policy. See our Manufacturers.
        久久亚洲欧美日本精品,美女高潮流白浆娇喘免费网站,男男受被攻做哭娇喘声视频,欧美狠狠入鲁的视频777色